Power Requirements


PGA TOUR

The ShotLink truck requires 3 phase, 200 AMP service. The Scoreboard truck requires single phase, 60 AMP service. The power requirements can be met using either commercial power or a generator.

Given the utilization of the scoring system by Broadcasting, Media and Tournament Hospitality, strong consideration should be made for the use of a generator to prevent the accidental loss of power to the ShotLink system. We strongly recommend the generator be serviced prior to installation and start up. This generator should exclusively power the ShotLink trailer.



PGA TOUR Champions

The ShotLink truck requires single phase, 60 AMP service. The Scoreboard truck is no longer powered up. The power requirements can be met using either commercial power or a generator.

Given the utilization of the scoring system by Broadcasting, Media and Tournament Hospitality, strong consideration should be made for the use of a generator to prevent the accidental loss of power to the ShotLink system.

ShotLink truck
60 Amp service, single phase